Skip to content
DIY Cost Lab

Gravel calculator and purchase comparison

Estimate gravel for a rectangular area, then compare a bag quote with a bulk quote using the supplier's actual package size, minimum order, increment and fees.

Your measurements

20 ft10 ft4 in
Illustration only — not to scale.
ft
ft
in

Enter the finished depth you want; confirm compaction needs for your project.

US tons/yd³

Input source: Illustrative default — replace with supplier data

Illustrative, editable assumption — not a product density. Use your supplier's figure; weight varies with stone type, size and moisture.

%

Default 5%. Covers cuts, breakage, spillage and settling. Configurable.

Bag quote

Enter the package information and every quoted cost. Leave a cost blank if it is unknown; enter 0 only when the supplier confirmed there is no charge.

Input source: Product label

ft³/bag

Input source: Product label

Use the volume printed on the product label.

Input source: User-entered quote

Optional. Enter your own quoted price; we never show market prices.

Input source: User-entered quote

Enter the quoted pickup, transport or delivery charge. Enter 0 only if none.

Input source: User-entered quote

Enter any other quoted bag-order fees. Enter 0 only if none.

Input source: User-entered quote

Enter the quoted tax amount. Enter 0 only if none.

Bulk quote

Supplier rules are applied to the quantity including waste. Minimum and increment are separate so half-yard and quarter-ton quotes remain exact.

Input source: Supplier quote

yd³

Input source: Supplier quote

yd³

Input source: Supplier quote

Examples: 1 for whole yards, 0.5 for half yards.

per yd³

Input source: User-entered quote

Optional. Enter your own quoted price; we never show market prices.

Input source: User-entered quote

Enter the quoted delivery or pickup charge. Enter 0 only if none.

Input source: User-entered quote

Include quoted loading, short-load or other supplier fees. Enter 0 only if none.

Input source: User-entered quote

Enter the quoted tax amount. Enter 0 only if none.

Estimate

2.59

cubic yards needed (incl. waste)

Approx. weight
3.63 US short tons
Bag order
140 bags

Before waste

Area200 ft² (18.58 m²)
Volume66.67 ft³ · 2.469 yd³ · 1.888 m³
Weight3.46 US short tons (3.14 t)

After waste & rounding up

Volume incl. waste70 ft³ · 2.593 yd³ · 1.982 m³
Weight incl. waste3.63 US short tons (3.29 t)
Bulk order after min. / increment3 yd³

Cost (based on prices you entered)

Bag material costUnknown
Bag quoted totalUnknown
Bulk material costUnknown
Bulk quoted totalUnknown

Bag quote vs bulk quote

Bag quote

Purchase quantity
140 bags
Package basis
0.5 ft³/bag from product label
Material represented
2.593 yd³
Estimated leftover
0 yd³
Material cost
Unknown
Quoted total
Unknown

At least one bag price, fee or tax amount is unknown.

Bulk quote

Purchase quantity
3 yd³
Estimated leftover
0.407 yd³
Material cost
Unknown
Quoted total
Unknown

At least one bulk price, fee or tax amount is unknown.

Complete every price, fee and tax field (enter 0 only when confirmed none) to compare quoted totals.

This compares only the complete costs you enter. Delivery access, handling, storage, convenience and product suitability are not scored.

An estimate for planning and ordering, not a guarantee. Confirm product coverage, density and local code requirements.

2.59 cubic yards needed (incl. waste)Details ↑

How it's calculated

  1. Volume (ft³) = length (ft) × width (ft) × depth (in) ÷ 12
  2. With waste = volume × (1 + waste% ÷ 100)
  3. Weight (US short tons) = yd³ × your density (short tons/yd³)
  4. Bags = required yd³ ÷ material per bag → round up to a whole bag
  5. Bulk order = max(required, supplier minimum) → round up to the supplier increment
  6. Quoted total = rounded purchase quantity × your unit price + your entered fees + your entered tax

The material estimate is kept separate from the purchase plan. Bags are always rounded to whole packages. Bulk quantity is rounded only after applying the supplier minimum and increment you enter.

The comparison names a lower estimated quoted total only when both totals are complete. It does not turn missing freight, fees or tax into zero and does not claim that the lower price is the best practical choice.

Worked example

20 ft × 10 ft area, 4 in deep, 1.4 short tons/yd³, 5% waste

  • Volume = 20 × 10 × 4 ÷ 12 = 66.667 ft³ = 2.4691 yd³
  • With 5% waste = 2.5926 yd³ (1.982 m³)
  • Weight ≈ 2.5926 × 1.4 = 3.63 US short tons
  • A 0.5 ft³ bag quote rounds to whole bags; a bulk quote follows its separate minimum and increment.

Figures generated by the same functions that power the calculator and covered by automated tests.

Assumptions & limitations

  • Density 1.4 US short tons/yd³ is an illustrative, editable assumption — not a universal product density.
  • A weight-only bag label is converted to volume using your density entry; the bag and density must describe the same product.
  • Blank costs remain unknown. Enter 0 only after confirming that a fee or tax does not apply.
  • Depth is the finished depth you want; compaction can require extra loose material.
  • No automatic compaction factor beyond your waste allowance.
  • Weight and weight-derived bag volume are only as accurate as your density entry.
  • The calculator does not evaluate delivery access, vehicle capacity, lifting, labor, storage or whether products are equivalent.

Frequently asked questions

How much does a cubic yard of gravel weigh?

It depends on stone type, gradation and moisture. Replace the illustrative density with the figure for the exact material in your quote.

Can I compare a bag sold by weight with bulk sold by volume?

Yes, but the bag volume must be derived from density. Make sure the density and bag weight refer to the same product; otherwise use a printed bag volume instead.

Why is my quoted total unknown?

At least one price, fee or tax field is blank. Blank means unknown rather than free. Enter 0 only when the supplier confirmed that charge does not apply.

Does the lower quoted total mean it is the best option?

No. The comparison covers only entered costs. Delivery access, handling, storage, time and product suitability can change the practical decision.