Your measurements

10 ft10 ft4 in
Illustration only — not to scale.
ft
ft
in

Patios and walkways are often 4 in; follow local code for driveways and footings.

%

Default 10%. Covers cuts, breakage, spillage and settling. Configurable.

Premix bag quote

Bag yields are nominal QUIKRETE Concrete Mix reference values. Check the yield on your exact product, and enter 0 only for a confirmed no-charge fee.

Input source: Manufacturer reference — verify product label

Input source: User-entered quote

Optional. Enter your own quoted price; we never show market prices.

Input source: User-entered quote

Enter the quoted pickup or delivery charge. Enter 0 only if none.

Input source: User-entered quote

Optional quoted rental total. Enter 0 only if none.

Input source: User-entered quote

Optional quoted labor total; the calculator does not estimate work time.

Input source: User-entered quote

Enter 0 only if none.

Input source: User-entered quote

Enter the quoted tax amount. Enter 0 only if none.

Ready-mix quote

The order volume including overage is rounded up after applying the supplier minimum and increment. Blank price or fee fields remain unknown.

yd³

Input source: Supplier quote

yd³

Input source: Supplier quote

Use the increment in your quote, such as 0.25 or 0.5 yd³.

per yd³

Input source: User-entered quote

Optional. Enter your own quoted price; we never show market prices.

Input source: User-entered quote

Enter the quoted delivery charge. Enter 0 only if none.

Input source: User-entered quote

Enter the quoted short-load or minimum-load charge. Enter 0 only if none.

Input source: User-entered quote

Optional quoted placing labor total; the calculator does not estimate crew needs.

Input source: User-entered quote

Enter 0 only if none.

Input source: User-entered quote

Enter the quoted tax amount. Enter 0 only if none.

Estimate

1.36

cubic yards to order (incl. waste)

80 lb bags (incl. waste)
62
Ready-mix order
1.5 yd³

Before waste

Slab area100 ft² (9.29 m²)
Volume33.33 ft³ · 1.235 yd³ · 0.944 m³
80 lb bags, no waste55.56 → 56

After waste & rounding up

Volume incl. waste36.67 ft³ · 1.358 yd³ · 1.038 m³
80 lb bags incl. waste61.11 → 62
Ready-mix after min. / increment1.5 yd³

Cost (based on prices you entered)

Premix bag material costUnknown
Premix bag quoted totalUnknown
Ready-mix material costUnknown
Ready-mix quoted totalUnknown

Premix bag quote vs ready-mix quote

Premix bag quote

Purchase quantity
62 bags
Yield basis
0.6 ft³/bag — manufacturer reference
Nominal bag weight
4,960 lb (2,249.82 kg)
Material represented
37.2 ft³ · 1.378 yd³ · 1.053 m³
Estimated leftover
0.533 ft³
Material cost
Unknown
Quoted total
Unknown

At least one bag price, pickup/delivery, rental, labor, other-fee or tax amount is unknown.

Ready-mix quote

Purchase quantity
1.5 yd³
Estimated leftover
0.142 yd³
Material cost
Unknown
Quoted total
Unknown

At least one ready-mix price, delivery, short-load, labor, other-fee or tax amount is unknown.

Complete every price, fee and tax field (enter 0 only when confirmed none) to compare quoted totals.

This compares only the complete costs you enter. It does not recommend a placing method or score scheduling, access, crew, equipment, physical effort, finish quality or product suitability.

An estimate for planning and ordering, not a guarantee. Confirm product coverage, density and local code requirements.

1.36 cubic yards to order (incl. waste)Details ↑

How it's calculated

  1. Volume (ft³) = length (ft) × width (ft) × thickness (in) ÷ 12
  2. yd³ = ft³ ÷ 27; m³ = ft³ × 0.0283168
  3. Order volume = volume × (1 + waste% ÷ 100)
  4. Bags = order ft³ ÷ bag yield (40 lb ≈ 0.30, 60 lb ≈ 0.45, 80 lb ≈ 0.60 ft³) → round up
  5. Ready-mix = max(order volume, supplier minimum) → round up to the supplier increment
  6. Quoted total = rounded purchase quantity × your unit price + your entered fees + your entered tax

We compute exact slab volume, then add your overage once. Bags are rounded to whole packages. Ready-mix is rounded only after applying the supplier minimum and increment you enter.

The comparison names a lower estimated quoted total only when both quotes are complete. It never treats a missing delivery, short-load, rental, labor, other-fee or tax value as zero.

Check: 10 ft × 10 ft × 4 in = 33.333 ft³ = 1.2346 yd³ → 56 bags of 80 lb with no waste, or 62 bags with 10% waste.

Worked example

10 ft × 10 ft × 4 in slab, 80 lb bags

  • Volume = 10 × 10 × 4 ÷ 12 = 33.333 ft³ = 1.2346 yd³ (0.9439 m³)
  • No waste: 33.333 ÷ 0.60 = 55.56 → 56 bags
  • 10% waste: 36.667 ÷ 0.60 = 61.11 → 62 bags

Figures generated by the same functions that power the calculator and covered by automated tests.

Assumptions & limitations

  • Bag yields 0.30 / 0.45 / 0.60 ft³ for 40 / 60 / 80 lb match the approximate yields QUIKRETE publishes for its standard Concrete Mix (No. 1101). Other mixes and brands differ — always check the yield printed on your bag.
  • Waste default 10% covers uneven subgrade, form flex and spillage.
  • Uniform thickness over a rectangle; thickened edges are not included.
  • Blank costs remain unknown. Enter 0 only after confirming that a fee or tax does not apply.
  • Not a structural design tool — reinforcement, base and thickness should follow local code and professional advice.
  • Does not include footings, thickened edges, steps or round slabs.
  • Does not recommend a mixing or placing method, crew size, equipment plan, schedule or safe handling procedure.

Sources

Yields are nominal approximations; your package label is authoritative.

Frequently asked questions

How many 80 lb bags are in a cubic yard?

Using the approximate 0.60 ft³ yield QUIKRETE lists for an 80 lb bag of its standard Concrete Mix, 27 ÷ 0.60 = 45 bags per cubic yard. With 60 lb bags (≈0.45 ft³) it's 60 bags; with 40 lb (≈0.30 ft³) it's 90.

When does ready-mix make more sense than bags?

Compare complete local quotes, access, scheduling, equipment, crew needs and product suitability. This calculator compares entered costs and quantities only; it does not recommend a placing method.

How thick should a slab be?

4 inches is common for patios and walkways; driveways and slabs carrying heavier loads are often thicker. Local code and your design determine the right thickness.

Can I enter thickness in feet?